Floor Tile and Mastic Removal in Huntington Park

Typical cost in Huntington Park

  • One bathroom or laundry floor, up to about 100 sq ft$1,200 – $3,000+
  • Kitchen floor, about 200–300 sq ft$2,000 – $5,000+
  • Several rooms of flooring, about 1,000 sq ft$5,000 – $12,000+

Floor work in Huntington Park begins with samples of the tile, the sheet flooring and the mastic below, taken one layer at a time. Rule 1403 reaches resilient floor covering holding more than one percent asbestos, and only a sample shows whether a particular floor crosses that line.

Every layer of flooring down to the joist level is part of the survey, so carpet laid over an older floor is checked too, as is a sheet floor under a newer one.

Request a free quote
Kitchen floor of faded 9-inch square vinyl tiles in a mottled rose-beige pattern beside wooden cabinets and a white range

Flooring we remove

Vinyl floor tile

South Coast Air Quality Management District describes asbestos-containing floor tile as including asphalt and vinyl tile. We sample the tile and the layer below it before any of it is lifted.

Mastic under the tile

Mastic is sampled along with the tile, and both results go in the same report.

Sheet vinyl

Whether a sheet floor is covered depends on whether it holds more than one percent asbestos, and only a sample answers that.

Flooring under carpet or new floor

A newer floor may sit on an older one. The survey goes through every layer because the rule reads all layers of flooring.

Planning a floor job

Knowing the layers first makes a floor job easier to plan, and the survey samples each layer down to the joist level.

Garages and utility rooms

A garage or laundry room can carry old tile just as a kitchen can, so every room in the project gets sampled.

The district notice

Demolition needs the district notification no later than 10 working days before the work starts, and so does any renovation that removes 100 square feet or more of asbestos-containing material. We file online with the district notification fee. If the floor belongs to a rental, put that lead time on the unit’s schedule.

Waste

Hazardous-waste rules cover friable material from a floor job in California, which means a licensed hauler and a manifest. Nonfriable tile falls outside that waste table, although another agency may still restrict it. Ask us how a particular floor’s waste will be classified, and we will explain it against the sample results.

Kitchen with a patterned vinyl floor, one piece lifted at the left edge to show a gray felt backing, white cabinets and a white range

Sampling for any floor job is covered under asbestos testing, which explains who takes the samples and what the survey records. Our other services are listed on the main page, with a page for each one.

Request a free asbestos removal quote

We recommend calling, but do feel free to contact us using this form. We'll get back to you with a free, personalized quote or additional questions as soon as possible. We're here to help.

Call (562) 635-7829

Call (562) 635-7829