Asbestos Testing and Surveys in Huntington Park

Typical cost in Huntington Park

  • Testing for a small remodel, a few samples$400 – $800+
  • Whole-house survey before a remodel or demolition$600 – $1,500+
  • Air test after removal (clearance)$400 – $1,000+

Testing is how you find out whether a ceiling, floor or wall has asbestos before it is disturbed. South Coast Air Quality Management District’s survey rule applies prior to any demolition or renovation, so a remodel plan in Huntington Park that is not a small single-unit renovation starts with this step.

A consultant or technician whom Cal/OSHA has certified, with EPA Building Inspector training, carries out the survey. Leave the sampling to them, and call us to talk over what your project needs covered. For a rental property, tell us how many units the work touches, since the survey rule treats a house and an apartment building differently.

Request a free quote
Entry hall with a wooden staircase, small taped sample patches on the ceiling and walls, and sealed sample bags and paper on the bottom steps

What testing covers

Samples for a remodel

Say your plan is a new kitchen floor and a bath wall. The survey then goes through each flooring layer to the joist level and reaches into the wall or ceiling cavities where the material needs identifying and sampling. Your report lists each sample, its location and the lab’s finding, tied back to the plan.

Survey before a teardown

A teardown calls for the survey and the district notice regardless of what the samples show. The report then lists the material to deal with before the building work begins.

The lab report

Read the report as a record of the samples, their locations and the lab results. It does not clear later work on its own.

Newer buildings

The rule has no cutoff by build year. A building from any decade still gets the survey before demolition or renovation, apart from the small single-unit carve-out explained below.

Who tests and what counts

The people and the thresholds differ between agencies, so it helps to see them side by side.

Consultants and technicians

In California, asbestos consulting belongs to a Cal/OSHA-Certified Asbestos Consultant alone. Once a project reaches 100 square feet or more, the consultants and technicians who sample it, plan the removal or oversee it must also be certified, so certification counts for more as the project grows.

Two percentage lines

Two thresholds are in play when a lab result comes back. Cal/OSHA looks at material above 1/10th of 1 percent asbestos by weight to protect workers, while the air district and the waste table start at 1 percent. One sample can therefore sit on different sides of the two lines.

The small single-unit carve-out

For the survey there is a small-job break, and it is narrow. A renovation in a residential single-unit dwelling that removes less than 100 square feet of asbestos-containing material falls under it. Rented houses count as single-unit. Apartment buildings, townhouses and condominiums do not, and demolition never qualifies. The sample result is how you learn the amount, so testing still comes first when you are planning.

Wall opened up around an electrical panel, with plastic sheeting taped around the opening and spread over the wood floor

Once the survey is in hand, floor tile and mastic removal is one possible next job, and our full list of services sits on the main page.

Request a free asbestos removal quote

We recommend calling, but do feel free to contact us using this form. We'll get back to you with a free, personalized quote or additional questions as soon as possible. We're here to help.

Call (562) 635-7829

Call (562) 635-7829