Renovation and Demolition Abatement in Huntington Park

Typical cost in Huntington Park

  • Kitchen or bathroom remodel, one or two materials$2,000 – $5,500+
  • Whole-house remodel or teardown, several materials$15,000 – $40,000+

The survey applies prior to any demolition or renovation, and every demolition needs the district notice. We handle the removal that comes out of the survey so the building work can go ahead.

Call us with the scope. We separate the parts that count as renovation from the parts that count as demolition and explain which steps each needs.

Request a free quote
Small single-story house behind a chain-link fence with a dumpster covered in plastic sheeting at the curb and a dry dirt lot

What we handle before the work

Kitchen and bath remodels

Remodels are renovations. The small-job lines depend on how much asbestos-containing material is removed, and testing is how you learn that amount.

Walls that carry load

Pull out a load-bearing wall and you have a demolition, since the district’s definition takes in any load-supporting structural member. The survey and the notice both apply.

Additions and teardowns

A teardown is demolition, so the district notice goes in even when no asbestos turns up. The district says state law has the permit applicant give the building department a copy of that notice, so the notice is worth lining up before the permit application.

Apartment and commercial buildings

Larger buildings are covered by the same rule, since the district defines a facility to include residential, commercial and industrial structures. Neither small-job carve-out reaches apartment buildings.

Which district steps apply

Three separate district rules shape a renovation or demolition job, and each one has its own reach, so they are taken one at a time.

The notice

The notification goes to South Coast Air Quality Management District no later than 10 working days before demolition, or before a renovation that removes 100 square feet or more of asbestos-containing material. A district notification fee goes with it. Renovation removing less than 100 square feet is outside the notice rule in any building type, and demolition never is.

The survey

The survey is done prior to any demolition or renovation, and renovations of residential single-unit dwellings that remove less than 100 square feet of asbestos-containing material are carved out of it. Tell us whether the building is a house or a larger building, since the carve-out depends on that.

Checking a contractor

Before you sign for work of 100 square feet or more of asbestos-containing material, check two things. The contractor needs a Cal/OSHA registration, and a C-22 Asbestos Abatement classification from the Contractors State License Board or a qualifier who passed the asbestos exam. Ask every bidder the same questions so the answers compare.

Empty room with plastic sheeting over the walls and windows, a wood floor and a portable air machine with a gray hose

Every job here starts with sampling, which asbestos testing explains in detail, from who takes the samples to what the report records. The other services we offer are listed on the main page, with a page for each material.

Request a free asbestos removal quote

We recommend calling, but do feel free to contact us using this form. We'll get back to you with a free, personalized quote or additional questions as soon as possible. We're here to help.

Call (562) 635-7829

Call (562) 635-7829